Proper
Zoning?
Subdivision
Of Land
Required?
Rezoning
Requested
Planning Commission
Public Hearing
And Recommendation to BOC
BZD
 Administrative Review
Erosion Control Plan Submitted
Site Design Also Required for
60+ Lot Subdivisions or
10+ disturbed acres for
Stand-Alone Projects
Site Design Includes
Storm Water Calculations/Design
And Construction Documents
NOI Submitted to EPD
Copied to BZD
Land Disturbance
Permit Issued
Sewage
Disposal
Required?
Land
Disturbance
Permit
Required?
Major or
Minor/Exempt?
BOC Decision
Property Lines and
Proposed Structure
 staked to verify
setbacks
Building Permit Issued
Using 2000 International Building Codes
Preliminary Plat Review
By Planning Commission
Recommended
Pre-Development
Meeting
Pre-approval required from
Dalton Utilities and/or Health Dept
Dalton Utilities/Health Dept
Approval Required
NRCS Approval
Required for
Erosion Control Plan
Begin Multiple Inspections of
Road Construction (Public Works)
Erosion Control/Storm Water
Measures and Structures
Health Dept
And/Or
Dalton Utilities
Approval Required
Continue inspections for
Erosion control/storm water measures
Until NOT is issued
and permanent stabilization achieved
No
Yes
Yes
No
Yes
No
Yes
No
Major
Denied
Approved
Denied
Approved
Denied
Minor/Exempt
Approved
Denied
Approved
FLOW CHART FOR BUILDING, ZONING AND DEVELOPMENT
Approved
Approved
Final Plat
Approval
 Required?
Yes
No
BZD
Administrative Review
Health Dept
And/Or
Dalton Utilities
Approval Required
Approved